Two component fast curing elastic cold applied liquid containing polyurethane and bitumen, It is a membrane with a high elasticity, adhering perfectly to any surface it is applied to.
Advantages
Attention should be paid to the application temperature, the application should be done between +5 0C and +35 0C. It should not be applied under rain or in situations where precipitation may occur. The application should be made on the part of the structure that comes into contact with water, and attention should be paid to the drying times in applications between primers and coats. It should be taken into account that the drying time may also be prolonged, as the curing time will increase in cold weather. The materials used can be cleaned with water and solvent based thinner. On the basis
of application, protective gloves and goggles should be used. For detailed information, please refer to the product MSDS documents.
Packaging
20 + 20 kg double component
Shelf life is 8 months. It should be stored in a cool and dry environment away from direct sunlight and protected from frost.
Before applications, the surface must be firm, dry and free of loose parts. Before application, all surfaces should be cleaned of oil, grease, paraffin wastes, cement grout, loose particles, mold release agents, cured old membranes and active surfaces such as these that will weaken the adherence. The surface should be cleaned and dried by washing with high pressure water if possible. EPIKON BİTÜM PU PRIMER should be used for absorbent surfaces such as concrete, screed and wood. Application should be done with brush and roller. It is mixed for a few minutes with a low-speed mixer and made ready for use. The usage time varies in direct proportion to the change in air temperatures.
The components are first mixed and combined separately with a low-speed mixer. The combined A+B components are mixed for a few minutes with a low-speed mixer and made ready for use. The prepared mixture is 20 degrees 30-35 minutes. The usage time varies in direct proportion to the change in air temperatures. It should be applied in at least two coats with the help of a roller, spatula or brush until the entire surface is covered and poured onto the primed surface. After the first coat is applied, the second coat should be applied within a minimum of 12 and a maximum of 24 hours. Waiting time between coats should not exceed 48 hours. Tools used after the application should be cleaned within 2 hours. Min.1.5-2.0 lt/m2 should be applied.